Property registration guide : patta sitta adangal fmb pathiram online

Whether you are buying a land/plot or house or apartment/flat, whatever verifying all documents before making agreement and taking all the documents is necessary to avoid any scams:

Sale Deed Document(pathiram) is registration department's record (

This only is not enough to claim as your property. The following documents also required to claim/prove your possession of property in the court in case of any dispute:

Patta/TSLR is a revenue department record maintained by thasildar

Chitta is a revenue department record maintained by vao 

Adangal is for agricultural land mentions the crop detailed

A registar 

FMB Field measurement book (Topo sketch)



In all the empty land/agricultural land/house document the following details are mentioned:

Survey number/Town Survey TS Number, Sub division number, Plot number, 

District name, Taluka, Ward, Block


WEBSITE FOR VILLANGAM EC by registration department

https://tnreginet.gov.in/portal/webHP?requestType=ApplicationRH&actionVal=homePage&screenId=114&UserLocaleID=en&_csrf=ed8ff27b-df22-42be-9814-eebf15adc295


PATTA/CHITTA/FMB by revenue department

https://eservices.tn.gov.in/eservicesnew/land/chitta.html?lan=en


Ward/block details

http://www.salem.tn.nic.in/delimit.htm


Documents required additionally: 

For Agricultural land: Sitta & Adangal

For House: Property tax , Drainage tax, Electricity bill, Water tax



சொத்துகள் வாங்கும்போது:


சொத்துகளைப் பத்திரப் பதிவு அலுவலகத்தில் பதிவு செய்து, அதற்கான பத்திரம் இருந்தால் மட்டும் சொத்து பத்திரமாக இருப்பதாக அர்த்தம் கொள்ள முடியாது. அது சொத்து வாங்குவதன் முதல் படிதான். அந்தச் சொத்தை வருவாய்த் துறையில் பதிவு செய்து, பட்டா பெற்றால் மட்டுமே, அது முழுமையாகச் சொந்தமாகும். 

நிலப் பதிவேடு - நில உரிமை (பட்டா & புலப்படம் / சிட்டா / நகர நில அளவைப் பதிவேடு)

பட்டா:

நிலத்தின் உரிமை யாருக்கு என்பதைக் காட்டுவது பட்டா. இதில் மாவட்டத்தின் பெயர், ஊரின் பெயர், பட்டா எண், உரிமையாளர் பெயர் போன்ற விவரங்களுடன், சர்வே எண்ணும் உட்பிரிவும் குறிப்பிடப்பட்டிருக்கும். அந்நிலம் நன்செய் நிலமா அல்லது புன்செய் நிலமா என்னும் விவரமும், நிலத்தின் பரப்பு மற்றும் தீர்வையின் விவரங்களும் இருக்கும்.

சிட்டா:

ஒருவருக்குக் குறிப்பிட்ட கிராமத்தில் எவ்வளவு நிலம் இருக்கிறது என்பதைக் குறிக்கும் அரசாங்கப் பதிவேடுதான் சிட்டா. சிட்டாவில் சொத்தின் உரிமையாளர் பெயர், பட்டா எண்கள், என்ன வகையான நிலம் அதாவது நன்செய் அல்லது புன்செய் பயன்பாட்டில் இருக்கிறதா என்ற விவரமும் நிலத்திற்கான தீர்வை கட்டிய விவரமும் சிட்டாவில் குறிப்பிடப்பட்டிருக்கும்.

அடங்கல்

ஊரில் இருக்கிற மொத்த சர்வே எண்கள் அடங்கிய பதிவேடுதான் ‘அடங்கல்'. அடங்கலில் குறிப்பிட்ட சர்வே எண்ணுக்கு உரிய நிலம் யார் பெயரில் இருக்கிறது, பட்டா எண், நிலத்தின் பயன்பாடு என்ன போன்றவை குறிப்பிடப்பட்டிருக்கும்.


நாம் வாங்கும் சொத்துக்கு சார்பதிவாளர் அலுவலகத்தில் பதிவு செய்யும் கிரயப்பத்திரத்துக்கு முந்தைய பத்திரம் தான் தாய் பத்திரம் எனப்படுகிறது.



பத்திரப் பதிவு ஆவணத்தை விற்பனை ஆவணம் (Sale Deed) என்று சொல்வார்கள்.  சொத்தின் மதிப்பில்(மனை+கட்டிடம்) 7 சதவீதம் முத்திரைக் கட்டணமாகவும், 1 சதவீதம் பதிவுக் கட்டணமாகவும் வசூலிப்பார்கள். 

Conventional Shuttering - Formwork

VERTICAL FORMWORK (Footings & Columns)

1.All components are arranged for making with proper spacing of runners as per formwork drawing (Plywood, 2*4 runner, 4*4runner, Nails)

2.Diagonal Dimension has been checked.(Corners are at right angle)





  

3. Tie rods are in proper place and in tight position
4.Adjustable props are fixed properly with Form sides and aligned
5.All Sides are in plumb along the vertical direction
6.Proper scaffolding is made for pouring of concrete around the Formwork
 


HORIZONTAL FORMWORK (Beams & Slabs)
1.The formwork system is resting on the proper leveled and compacted ground\RCC Slab.

2.Formwork Components has been arranged

3.The extension of the Base jack and u head is not more than 280mm

 


4.Primary beam (6"X4" Timber\Peri Girders) resting properly over the U heads. Minimum bearing length of the primary member should be the width of the Primary member.


5.The cantiliver length of the primary beam must not be more than 250mm from the centre of the U head

6.Above that acrospan and MS Sheets are placed.

7.The face of Formwork are clean and shuttering oil is applied properly on the surface.

 

Shuttering (Form Work) - Aluminium Form Work (S-Form) - Mivan shuttering

Advantages of aluminium formwork over conventional shuttering:

1.High speed (4days over 10days slab cycle)
2.Quality of surface finish smooth
3.More accurate
4.Higher repetition (200times over 50times)

Procedure:

1.The Marking for the wall is done as per the drawing & the entire area is cleaned before start of work


2.All Formwork has been cleaned and coated with approved release agent

3.All Flat ties installed & All P.E wall tie sleeves correctly installed



Latest Construction Material Prices - Best Brands - Tamil Nadu


Following latest construction material prices in tamil nadu
1.Cement

Types: Slag Cement/PPC/OPC 43/ OPC53Price Band: varies between Rs.290 to 380Weight per bag: 50kgsExpiry Date: 12weeks/3months2 types of pack:HDPE Poly Pack – 10Rs lesserPaper Pack

2.Sand

Msand concrete grade: 4000 per unit
Msand Plaster Grade: 5000-7000 per unit
River sand
Rs.5500-12000/- per unitwww.tnsand.in
                                   1 unit is 100 cft




3.Aggregates

12mm Jelly
Rs.35/ cft

20mm JellyRs.40/cft

40mm JellyRs.38/cft

4.Bricks

Clay BricksRs.5-7.5/nos

Flyash BricksRs.4.5-6/nos

Latest Civil Labor Rates - Tamil Nadu - Piece Work and NMR and Nominal Labour Productivity

Labour Charges (Piece Work Rate)
Work Amout UOM
1 Brick work  215 sqm
2 Wall Plastering 85 sqm
3 Ceiling Plastering 85 sqm
4 External Plastering 175 sqm
5 Block work 8" 115 sqm
6 Block work 6" 115 sqm
7 Block work 4" 115 sqm
8 Carpenter 135 sqm
9 Barbender 4 kg
10 Tile 161 sqm
 Painting    
11 OBD 2 sqft
12 Emulsion 2 sqft
13 Putty 4.5 sqft
14 Primer 3 sqft
Construction Workers NMR Salary 8h
Workers Salary (Rs)  
1  Mason 550 - 750  
2  Labor Mason Assistant (Male)  400 - 550  
3  Labor Mason Assistant (Female) 300 - 450  
4  Carpenters/Barbenders 550 - 750  
5  Plumbers 500 - 550  
6  Painter 500 - 550  
Labour  Standard Productivity
Work Mason MC FC Qty UOM
1 Brick work  1 1 1 1.25 sqm
2 Wall Plastering 1 1 1 10 sqm
3 Ceiling Plastering 1 1 1 8 sqm
4 External Plastering 1 1 1 8 sqm
5 Block work 8" 1 1 1 10 sqm
6 Block work 6" 1 1 1 8 sqm
7 Block work 4" 1 1 1 8 sqm
Work Skilled Unskilled Qty UOM
8 Carpenter 1 1 4 sqm
9 Barbender 1 1 200 kg
10 Tile 1 1 10 sqm
  Painter      
11 OBD 1   600 sqft
12 Emulsion 1   800 sqft
13 Putty 1   600 sqft
14 Primer 1   800 sqft

Quick Method of Highrise Building Estimate


SBA means Super Builtup Area
From this activities measurements are calculated. 
For each activity from the material coefficients, material required is calculated & latest material rates can be found here.
Labour part is applied in either two ways: Piece Work or NMR(Nominal Muster Roll-Hourly Basis).

For example: For Plastering of  Xsqft, total estimate will be ( material coefficient of cement*latest cement rate + material coefficient of sand*latest sand rate + labour rate in PW or Productivity*NMR Labour Charge)* Qty(Xsqft)

Onsite Quick Material Calculations with civil engineering Coefficients

Material Coefficients



Sl no DESCRIPTION UOM  Cement  (Bags) Sand (Cum) Aggregates (Cum) Bricks / Blocks (Nos)
1 RMC M-7.5 Site mix  Cum          3.367           0.468 0.94
2 RMC M-10 Site mix  Cum          4.378           0.456 0.91
3 RMC M-15 Site mix  Cum          6.254           0.434 0.87
4 RMC M-20 Site mix  Cum          7.959           0.415 0.83
5 RMC M-25 Site mix  Cum        10.944           0.380 0.76
6 8" Solid Block Work with CM 1:6 Sqm          0.096           0.021 12.50
7 6" Solid Block Work with CM 1:6 Sqm          0.072           0.016 12.50
8 4" Solid Block Work with CM 1:6 Sqm          0.048           0.011 12.50
9 230mm Brick Work with CM 1:6 Sqm          0.262           0.058 57.97
10 115mm Brick Work with CM 1:6 Sqm          0.131           0.029 57.97
11 Brickwork in Cum Cum          1.440           0.250 504.10
12 Cement Slurry for columns,Beams (1:3 mix, 5mm thk) Sqm          0.045           0.005
13 Internal Ceiling Plastering 12mm thk in CM 1:4 Sqm          0.104           0.015
14 Internal Wall plastering 15mm thk in CM 1:6 Sqm          0.096           0.021
15 External Wall Plastering Sponge finish 20mm in 2 layers: 1st coat 12mm in CM 1:4 and top coat 8mm in CM 1:6 with water proof chemical Sqm          0.149           0.028
16 Mesh for internal/external  wall plastering Sqm          0.017           0.001


Shuttering Runner Coefficients  
Retaining Wall Coefficient
S. No Runner Co efficient
1 4 x 2 0.04 cum
2 4 x 4  -
3 6 x 4 -
Beam Coefficient
S. No Runner Co efficient
1 4 x 2 0.05                         cum
2 4 x 4 0.06                         cum
3 6 x 4 0.03                         cum
Slab Coefficient
S. No Runner Co efficient
1 4 x 2 0.06                   cum  
2 4 x 4 -
3 6 x 4 0.44                   cum
 CEMENT CO-EFFICIENTS
 S/N   DESCRIPTION   UNIT   CO-EF 
 CONCRETE 
     1  P.C.C.1:4:8 below foundation/floors   CUM          3.30
     2  R.C.C. M-25 footing    CUM          7.50
     3  RCC M20 for Roof slab/beam, columns,&stair case   CUM          6.80
     4  DPC 1:3:6   CUM          4.50
 MASONRY WORKS 
     5  SSM for foundation/basement   CUM          1.60
     6  200 mm Solid block   SQM          0.18
     7  100 mm  Solid Block    SQM          0.12
     8  150 mm  Solid Block    SQM          0.15
     9  230 mm Brick Masonry   Cmt          1.40
 PLASTERING 
  10  Ceiling plastering   SQM          0.13
  11  Internal wall plastering   SQM          0.12
  12  Rough plaster in walls(Dadoback)   SQM          0.12
  13  External plastering   SQM          0.20
  14  Basement waterproof plastering    SQM          0.18
 STAIRCASE WORKS 
  15  Tread-Multicolour-20mm  thk.   SQM          0.22
  16  Riser-Multicolour-20mm thk.   SQM          0.22
  17  Tread-Sadaralli -10mm thk.   SQM          0.22
  18  Riser-Sadaralli -10mm thk.   SQM          0.22
 FLOORING 
  19  Screed concrete    SQM          0.40
  20  Multicolour  granite 20 mm   SQM          0.22
  21  Multicolour  granite 10 mm   SQM          0.22
  22  Sadaralli granite   SQM          0.22
  23  Vitrified tile flooring (Labour only)   SQM          0.22
  24  Cudappa slab flooring   SQM          0.22
  25  Eurocon Tiles for ramp   SQM          0.22
  26  Broken  tile  flooring   SQM          0.30
 WALL TILING 
  27  Toilets & Pantry   SQM          0.22
  28  Ceramic tile dadoing (Plasma gold)   SQM          0.22
  29  Ceramic tile dadoing (Karara grey)   SQM          0.22
  30  Multi colour Wall Dado 20 mm thick   SQM          0.22
  31  Jet Black Wall Dado 20mm thick   SQM          0.22
 SKIRTING 
  32  Granite tile-Multi colour   Rm        0.025
  33  Sadralli granite   Rm        0.025
  34  Vitrified  tile-glossy(Labour only)   Rm        0.025
  35  Cudappah slab skirting   Rm        0.025
  36  Cement  skirting   Rm        0.030
 MISCELLANEOUS 
  37  Multi colour granite coping 20 mm   SQM          0.22
  38  Multi colour granite coping 10 mm   SQM          0.22